25% (73)
•
864 views
•
12 pages
ABB Expert Optimizer Upgrade at Votorantim Cimentos Plants
AI-enhanced description
This document describes the upgrade of ABB's Expert Optimizer system at Votorantim Cimentos' Itau and Salto plants in 2008/2009, replacing aging hardware while retaining over a decade of process knowledge. The upgrade introduced new technologies like Model Predictive Control (MPC) and Mixed Logical Dynamic (MLD) systems, resulting in more stable alternative fuel usage, improved clinker quality, and reduced production costs.
Uploaded by
leonie.RICHARD
Loading document…
Failed to load PDF
Download insteadYou might also like
PDF
17% (18)
TH 02, TH 102, TH 202 HART Temperature Transmitter Operating Manual
14 pages
PDF
95% (77)
KECA 80 O135 Outdoor Current Sensor Installation, Use and Maintenance Manual
10 pages
PDF
20% (92)
ABB Data Center Power and Automation Product Portfolio
13 pages
PDF
33% (94)
SafePlus SF6 Insulated Compact Switchgear Installation and Operating Instructions
8 pages
PDF
25% (46)
RE_54_ Protection and Control Terminals Operator's Manual
48 pages
PDF
62% (90)
ACH550-UH HVAC Drives Installation, Operation and Maintenance Manual
104 pages
PDF
36% (55)
AMG 0180–0500 Marine Synchronous Generator Manual
71 pages
PDF
48% (76)
ABB i-bus KNX LK/S 4.2 Line Coupler Installation and Operating Instructions
2 pages
PDF
92% (34)
TQD/TMQD Breaker Mounting Kit Installation Instructions
2 pages
PDF
61% (34)
Tmax XT XT6 Fixed Part and Conversion Kit Environmental Product Declaration
17 pages
Sponsored