SRP Centralized Protection and Control Pilot White Paper
This white paper details Salt River Project’s (SRP) pilot implementation of a Centralized Protection and Control (CPC) system at a 69/12.47 kV substation, moving from a distributed PAC approach to a centralized one using merging units and a CPC device. It covers the design, engineering, installation, testing, and commissioning process, including lessons learned during the COVID-19 pandemic, to demonstrate how IEC 61850 and modern computing enable more adaptable and reliable substation protection.
Failed to load PDF
Download insteadYou might also like
M3EB/M3EH Series Induction Servomotor Manual
88 pages
N3 Series Wet Location Exit Combo Installation Instructions
2 pages
ACS800-11/U11 Drives Hardware Manual
152 pages
Pictogram Steel Sign Installation Instructions
2 pages
DCS800 12-Pulse Serial and Excitation Parameter Guide
15 pages
NEMA 180-449 and IEC 112S-280H Explosion-Proof Motors Installation & Operating Manual
36 pages
Energy Storage Converter Technology Application Guide
48 pages
EHM3211T Electric Motor Technical Specification Sheet
9 pages
Busch-Wächter 6747 WaveLINE Motion Detector Operating Instructions
20 pages
AC/S 1.2.1 Application Controller Manual
8 pages