16% (53) 304 views 4 pages

PowerMark Gold Meter Socket Load Center Installation Instructions

AI-enhanced description

This document provides installation instructions for GE PowerMark Gold™ meter socket load centers, covering models rated for 150 and 200 amps in outdoor underground service entrance applications. It includes step-by-step guidance on removing covers and shields, mounting the box, wiring mains and neutrals, installing breakers, and safety warnings to prevent electrical shock.

Uploaded by CHLOÉ_418
Download
/ 4
Loading document…