80% (28) 840 views 4 pages

SACE PR111 Microswitch Positioning Instructions

AI-enhanced description

This document provides instructions for positioning the microswitch on the SACE PR111 electronic release unit, used with ABB SACE Emax E1 to E6 circuit-breakers. It includes multilingual labeling for open/closed status and color coding (white) to assist with correct configuration according to the adjacent table.

Uploaded by daniel-Xyz
Download
/ 4
Loading document…