9% (92) 1.8k views 2 pages

ABB Engineer-to-Order Permian Basin Case Study

AI-enhanced description

This case study details how ABB’s Engineer-to-Order (ETO) team collaborated with a major Permian Basin operator to scale production from 60 to over 225 wells annually. The tailored, turnkey solution streamlined installation, reduced man-hours, and enhanced operational efficiency to help the customer achieve a target of 1 million oil-equivalent barrels per day by 2024.

Uploaded by maxime52
Download
/ 2
Loading document…