45% (88) 2.0k views 2 pages

GCB100 Alarm and Auxiliary Switch Installation Instructions

AI-enhanced description

This document provides installation, removal, and verification instructions for field-installable alarm and auxiliary switches used with GCB100 (2P and 3P) frame circuit breakers. It includes multilingual safety warnings, wiring specifications (24 AWG, 0.20 mm²), UL technical specs, and continuity check procedures for accessory leads.

Uploaded by Aurora46
Download
/ 2
Loading document…