61% (89)
•
340 views
•
10 pages
PST/PSTB Softstarter Torque Control Upgrade Instructions
AI-enhanced description
This document provides step-by-step instructions for upgrading a softstarter to Torque Control, requiring replacement of both the LV board and HV board with specific versions. It includes ESD warnings, required tools, and detailed procedures for disconnecting cables, removing covers, and replacing the circuit boards.
Uploaded by
mason.THOMAS
Loading document…
Failed to load PDF
Download insteadYou might also like
PDF
57% (11)
SACE XT2-XT4 Ekip COM Communication Modules Technical Reference
13 pages
PDF
22% (89)
Tmax T4-T5 Plug-In Circuit-Breaker Fixed Part Technical Data Sheet
3 pages
PDF
4% (70)
AC500-S DX581-S Safety Output Parallel Connection Application Note
23 pages
PDF
2% (51)
MS116, MS132, MO132 Motor Protection Circuit Breakers EAEU Certificate of Conformity
7 pages
PDF
96% (1)
ABB Locking Accessory Safety Instructions
3 pages
PDF
88% (80)
ABB MS/MO Series Motor Protection Circuit Breakers Certificate of Conformity
5 pages
PDF
29% (51)
62851 U-WL Dimming Actuator Manual
10 pages
PDF
79% (16)
ABB Ability Operations Management System for Mining Business Drivers
3 pages
PDF
50% (44)
HD4 Retrofit into Safesix Enclosure Installation and Service Instructions
18 pages
PDF
52% (81)
Limitamp Medium Voltage Motor Control Center Application Guide
52 pages